Project view
Autobraid
| Long Title: | Economic Serial Production of Textile Preforms via Braid Processes through Integration |
| Runtime: | 01.05.2011 – 30.04.2013 |
| Funding Body: | AiF e.V. |
| Consortium Manager: | IfU |
| Project Manager: | Dipl.-Wirt.-Ing. Sebastian Reuter |
| Project Holder: | Bundesministerium für Wirtschaft und Technik (BMWi) |
| Partner: | Institut für Textiltechnik (ITA) - RWTH Aachen University Werkzeugmaschinenlabor (WZL) - RWTH Aachen University |
| Description: | |
The production of fabric-reinforced synthetic components in small and medium-sized companies is currently based on handicraft. Unprofitable production processes (e.g. fabrication preparation and ramp up), unsteady quality and small lots are basic deficits. The project AutoBraid aims to ensure an economic serial production of preforms with the help of a braid process by integrating automatic action methods and online quality assurance to monitor, regulate and control the quality of the braid process.
|
|
![]() |
|


